IoT Energy Monitoring for Factories - From Meter to Dashboard to Decision
The Meter and Communication Layer
For industrial applications: three-phase PES-20 meters with Modbus RTU/TCP, connected via RS-485 bus to a data concentrator. Sampling at 15-minute intervals for billing, 1-minute for real-time monitoring. Redundant cellular backup is recommended for critical applications.
The Dashboard and Decision Layer
A well-designed industrial dashboard shows consumption by circuit, daily/weekly trends, cost attribution by cost centre, peak demand tracking, and anomaly alerts. Data should export in CSV or API format for integration with ERP or production systems.
Example Decisions
A circuit showing 35% higher consumption than baseline during night shifts prompts investigation. An alert on peak demand approaching the contracted maximum triggers load shedding of non-critical circuits before penalty charges apply. Contact Roopsikha at roopsikha@pesonline.co.in.
Have a metering project in mind?
Talk to our team — free site assessment available.